client
Municipality of Lucca
locality
Lucca
Cost
950.000,00 €
Date
2005-2006
dimensions
11.000 smq
team
Gianfranco Franchi
Giuseppe Lunardini
Chiara Tesi
Project details
The new boulevard has been completely redeveloped, with attention paid to resurfacing, the introduction of a bicycle path, and the addition of new trees and furniture. This intervention made it possible to create adequate space for pedestrians and to enhance the economic and social activities that line the street. A distinctive element of this redevelopment is the long sinuous kerb that delimits the cycle lane, composed of modules that combine harmoniously with each other. In addition to providing a clear separation between the cycle lane and the rest of the pedestrian space, this element gives a sense of fluidity and movement, creating a pleasant and welcoming environment for cyclists and pedestrians.